    钢结构厂房的质量与成本有什么关系?

    来源:http://lasimao.com/ 日期:2019-12-06 发布人:admin
      钢结构厂房的质量与成本有什么关系?
      What is the relationship between the quality and cost of steel structure workshop?
      钢结构工程是一项系统工程,它的每个组件,非常精确的计算,每个洞如果每个螺栓位置误差范围外的对项目的建设有很大的影响,也是一个组件的返工率增加,导致钢结构工程成本的提升,出现的一系列问题,如工期的延长。
      Steel structure project is a systematic project, each component of which is calculated very accurately. If the error of each bolt position outside of each hole has a great impact on the construction of the project, it is also the increase of rework rate of a component, which leads to the increase of steel structure project cost and a series of problems, such as the extension of construction period.
      影响钢结构造价的原因是构件的变形,大致有三个因素。
      The reason that affects the cost of steel structure is the deformation of components, which has three factors.
      首先是钢梁拱的问题。在钢结构厂房施工中,跨门刚架一般采用之字形拱架,在连接点连接端板即可实现。
      The first is the problem of steel beam arch. In the construction of steel structure workshop, the cross door rigid frame generally adopts zigzag arch frame, which can be realized by connecting the end plate at the connection point.
      第二个是钢结构厂房屋面檩条安装不当,造成檩变形太大,有一些钢结构工程水平系杆和杆连接板位置是不同的,导致水平支持系统不是一个平面,刚架的整体稳定造成一定的影响,这一点我们需要注意保持系杆和同意的方向杆折断。
    济南彩钢板厂
      The second is the improper installation of purlin on the roof of steel structure workshop, which causes too large deformation of purlin. The position of horizontal tie bar and bar connecting plate is different in some steel structure engineering, which results in that the horizontal support system is not a plane, and the overall stability of the rigid frame has a certain impact, which we need to pay attention to keep the tie bar and the agreed direction bar broken.
      第三,在一些钢结构厂房由于生产需要设置起重机,起重机梁和桁架没有弯曲,在实际施工中,这一指标往往被各方忽视,所以我们要特别注意这一点。
      Thirdly, in some steel structure factory buildings, cranes are required for production, and crane beams and trusses are not bent. In actual construction, this index is often ignored by all parties, so we should pay special attention to this point.
      刚开始进行钢结构工程项目设计时,应以认真、细心、耐心和全心的态度进行,以避免粗枝大干对工程质量的影响。
      At the beginning of steel structure engineering project design, it should be carried out in a serious, careful, patient and wholehearted manner to avoid the influence of thick branches and large stems on the engineering quality.